Thursday, May 25, 2017

The Rigging is Ready!

Today, Annie's rigging was finally finished with the installation of a topping lift, a Stay-Loc fitting inspection and re-install, and a good tuning.

Martin Marine showed up about 12:30 PM and by 2:30 PM, the rigging was finished. Martin used Samson Amsteel for the topping lift which has great durability and strength.

If you're ever in the Carrabelle area and need rigging - Martin Marine!


I also installed a CO2 and Fire Alarm, started the install of a manual Shore/Inverter switch, and started designing a method to secure the cockpit floor.

Lots to do and only 22 days to do it.

Fair seas and God bless!












No comments:

Post a Comment