Punch List...
All Items in Red are required BEFORE splash...
Bob-stayEngine raw water strainer installedEngine exhaustFuel filter installedMast wiredMast stepped/riggedInstall 30 lb. plow anchorHook up starter batteryAll standing rigging runBoom cradle installBoom install/rigEngine oil changeEngine timingEngine injector replacedEngine Fuel line replacedDeep Cell Batteries installedRudderTiller installedUnderwater lights ordered and installedWhisker staysVHF radio installedWire nav stationElectric reinstalledBow lightsEngine re-installedChart plotter decided and installed (order GPS receiver)Propeller install w/ zincDripless seal replacedShaft install/alignedConnect manual bilge pumpInstall ThrottleClean out diesel tanks (sub)V-Berth foam mattress ordered/installedBilge pump #1 (to switch to house battery bank)Engine/linkage/shaft testFix Waste SystemAll through hulls checked/servicedPressure wash/remove stripe/buff topsideCoast Guard Compliant Pack (Flares, Fire Ext, etc.)Bottom prep, repair, sand, prime, paintBoat-US Membership & Towing ServiceLiability Insurance (in case I run into someone)Afix Vinyl StripeAfix registration numbersInstall Boom TangsInstall fendersInstall all dock linesSplashInstall new headSeal dodger holes with epoxyPressure wash bilgeRemove all side panelRemodel galleyUpholstery repair/clean/diedSecure starter batterySole/floor reworkedInstall all LED lightingInstall battery chargerNew Solar panels installedEngine room remakeBowsprit platform supportsInstall two deck scupper grates (use Starboard)Boot/Top stripe prep, sand, paintMeasure dorade box placementOrder/install dorade boxesDrain, prep, paint bilge12V TV/DVD installedInstall oil lampsWater tanks (test and possibly replace)Rework companionway stepsHeadlinerRedo hardwood soleV-Berth reworkNew midline drop down tableHead cabinetryInstall head lightingRod holders installedInstall TP holder, TB holder, medicine cabinetInstall pressure waterInstall pull-out berthInstall pet-load scissor stepsInstall Wi-Fi long range systemInstall DC refrigerationInstall nature's headShorten back-stay by six inchesRV A/C installedSails setAll rigged running/standingDeck, prep, sand, paintCowl vent covers installedWeather gear purchased/stowedAdd deck fill for port diesel tankLower V-berthRemove holding tank and all hosesBottom paintAM/FM/IPOD Radio installedTopside paintBoat name affixedInside handrails installedCap-rail repairCompass purchase/installedLower the V-berth (includes removing holding tank)Rebed V-berth hatch (leaking)Eliminate unnecessary thru-hullsBottom paintTopside paint with nameReplace chain platesInspect/Replace necessary standing riggingRepair caprailsRework aft lazaretteAdd Two (2) 125 amp hour AGM batteriesInstall two additional solar panelsInstall wind generatorInstall inverterRework hatch turtleRepair water filter BracketRepair Manual Whale Gusher Bilge PumpSS Cotter pins all riggingNew lines to windvanePaint propPaint boat stand squaresBilge pump #2 (wire to switch to starter battery)Tighten whisker staysSand and varnish bowspritBelaying pins & rack.Install double hatch locks oncompanionwayVent water tanks above heel lineInstall inverter/shore power switchInstall depth finder/chart plotterWire DC side of refrigeratorBoom rigged- Port-lights sealed
- Stern light
- Dodger made/installed
- Life raft (2 or 4 Man)
Locate/I.D. and seal all leaksAll running rigging completed including staysail w/o staysail boom- Install tiller autopilot
7.5 Ft. dinghy installed- Paint deck
- Paint house
- Final paint touch-ups
No comments:
Post a Comment