Punch List

Punch List...

All Items in Red are required BEFORE splash...
  1. Bob-stay
  2. Engine raw water strainer installed
  3. Engine exhaust
  4. Fuel filter installed
  5. Mast wired
  6. Mast stepped/rigged
  7. Install 30 lb. plow anchor
  8. Hook up starter battery
  9. All standing rigging run
  10. Boom cradle install
  11. Boom install/rig
  12. Engine oil change
  13. Engine timing
  14. Engine injector replaced
  15. Engine Fuel line replaced
  16. Deep Cell Batteries installed
  17. Rudder
  18. Tiller installed
  19. Underwater lights ordered and installed
  20. Whisker stays
  21. VHF radio installed
  22. Wire nav station
  23. Electric reinstalled
  24. Bow lights
  25. Engine re-installed
  26. Chart plotter decided and installed (order GPS receiver)
  27. Propeller install w/ zinc
  28. Dripless seal replaced
  29. Shaft install/aligned
  30. Connect manual bilge pump
  31. Install Throttle
  32. Clean out diesel tanks (sub)
  33. V-Berth foam mattress ordered/installed
  34. Bilge pump #1 (to switch to house battery bank)
  35. Engine/linkage/shaft test
  36. Fix Waste System
  37. All through hulls checked/serviced
  38. Pressure wash/remove stripe/buff topside
  39. Coast Guard Compliant Pack (Flares, Fire Ext, etc.)
  40. Bottom prep, repair, sand, prime, paint
  41. Boat-US Membership & Towing Service
  42. Liability Insurance (in case I run into someone)
  43. Afix Vinyl Stripe
  44. Afix registration numbers
  45. Install Boom Tangs
  46. Install fenders
  47. Install all dock lines
  48. Splash
  49. Install new head
  50. Seal dodger holes with epoxy
  51. Pressure wash bilge
  52. Remove all side panel
  53. Remodel galley
  54. Upholstery repair/clean/died
  55. Secure starter battery
  56. Sole/floor reworked
  57. Install all LED lighting
  58. Install battery charger
  59. New Solar panels installed
  60. Engine room remake
  61. Bowsprit platform supports
  62. Install two deck scupper grates (use Starboard)
  63. Boot/Top stripe prep, sand, paint
  64. Measure dorade box placement
  65. Order/install dorade boxes
  66. Drain, prep, paint bilge
  67. 12V TV/DVD installed
  68. Install oil lamps
  69. Water tanks (test and possibly replace)
  70. Rework companionway steps
  71. Headliner
  72. Redo hardwood sole
  73. V-Berth rework
  74. New midline drop down table
  75. Head cabinetry
  76. Install head lighting
  77. Rod holders installed
  78. Install TP holder, TB holder, medicine cabinet
  79. Install pressure water
  80. Install pull-out berth
  81. Install pet-load scissor steps
  82. Install Wi-Fi long range system
  83. Install DC refrigeration
  84. Install nature's head
  85. Shorten back-stay by six inches
  86. RV A/C installed
  87. Sails set
  88. All rigged running/standing
  89. Deck, prep, sand, paint
  90. Cowl vent covers installed
  91. Weather gear purchased/stowed
  92. Add deck fill for port diesel tank
  93. Lower V-berth
  94. Remove holding tank and all hoses
  95. Bottom paint 
  96. AM/FM/IPOD Radio installed
  97. Topside paint 
  98. Boat name affixed
  99. Inside handrails installed
  100. Cap-rail repair
  101. Compass purchase/installed
  102. Lower the V-berth (includes removing holding tank)
  103. Rebed V-berth hatch (leaking)
  104. Eliminate unnecessary thru-hulls
  105. Bottom paint
  106. Topside paint with name
  107. Replace chain plates
  108. Inspect/Replace necessary standing rigging
  109. Repair caprails
  110. Rework aft lazarette
  111. Add Two (2) 125 amp hour AGM batteries
  112. Install two additional solar panels
  113. Install wind generator
  114. Install inverter
  115. Rework hatch turtle
  116. Repair water filter Bracket
  117. Repair Manual Whale Gusher Bilge Pump
  118. SS Cotter pins all rigging
  119. New lines to windvane
  120. Paint prop
  121. Paint boat stand squares
  122. Bilge pump #2 (wire to switch to starter battery)
  123. Tighten whisker stays
  124. Sand and varnish bowsprit
  125. Belaying pins & rack. 
  126. Install double hatch locks on companionway
  127. Vent water tanks above heel line
  128. Install inverter/shore power switch
  129. Install depth finder/chart plotter
  130. Wire DC side of refrigerator
  131. Boom rigged
  132. Port-lights sealed
  133. Stern light
  134. Dodger made/installed
  135. Life raft (2 or 4 Man)
  136. Locate/I.D. and seal all leaks
  137. All running rigging completed including staysail w/o staysail boom
  138. Install tiller autopilot
  139. 7.5 Ft. dinghy installed
  140. Paint deck
  141. Paint house
  142. Final paint touch-ups