Martin Marine showed up about 12:30 PM and by 2:30 PM, the rigging was finished. Martin used Samson Amsteel for the topping lift which has great durability and strength.
If you're ever in the Carrabelle area and need rigging - Martin Marine! |
I also installed a CO2 and Fire Alarm, started the install of a manual Shore/Inverter switch, and started designing a method to secure the cockpit floor.
Lots to do and only 22 days to do it.
Fair seas and God bless!